Desire: To construct a ascetically pleasing, environmentally sustainable exterior wall that can last the elements. TASK:Construct a 1:2 model incorporating a wall + window + roof/ eave using actual material elements. After construction test integrity with a hose, simulated rainfall for 5 minute period. Record the entire process. • Research • Sketches • Construction • Testing
Due to the scale of the wall appropriate footings were overlooked. The ground was cleaned and leveled as much as possible. The method of construction let us level out the minimal rises and falls in the ground that the wall was placed on through the layering of mortar.