Wednesday, August 11, 2010
Subscribe to:
Post Comments (Atom)
Desire: To construct a ascetically pleasing, environmentally sustainable exterior wall that can last the elements. TASK:Construct a 1:2 model incorporating a wall + window + roof/ eave using actual material elements. After construction test integrity with a hose, simulated rainfall for 5 minute period. Record the entire process. • Research • Sketches • Construction • Testing
uploaded by alex hunt\
ReplyDeletethese are the tools we used to cut the wood and mix the cement, and the materials.
The SIte for the Wall....nice and muddy....
ReplyDelete